Step 10: After merge, close the loop
Transition the ticket, comment the outcome, and add a footer comment to the source spec page so readers can trace each requirement to a ticket and PR.
When the PR merges:
/mk:jira-lifecycle transition AUTH-201 --to "Done" --resolution Fixed
/mk:jira-collaborate add comment to AUTH-201: "Shipped in PR #142. Spec §R1, AC1-AC3 satisfied. AC2 dashboard target is /app/dashboard (confirmed with PM)."
/mk:confluence-collaborate add a footer comment to page 12345: "AUTH-201 (Google OAuth) shipped in PR #142."Check the status names first. mk:jira-lifecycle reads them from the workflow cache in tasks/jira-workflows/ and asks for a resolution when the transition to Done requires one.
The footer comment on the spec page is the second write to Confluence in this walkthrough, after the questions in Step 2. It tells future readers which ticket and PR delivered each requirement.
Previous: Step 9: Implement with /mk:cook · All steps
Step 9: Implement with /mk:cook
The cook pipeline phase by phase: orient, plan, test, build, simplify, verify, review, ship and reflect. You read the review verdict before shipping, and the ship check runs at commit, push and PR.
PRD Intake Automation
Analyze incoming PRDs and tickets with mk:intake: product area, completeness score, root cause, codebase context and a structured comment.