Ticket to Code
Developer workflow from receiving a Jira ticket through understanding, planning, implementing, and shipping.
You picked up a Jira ticket. This playbook goes from reading it to a PR and an updated ticket, one command per step.
Best for: Developers picking up tickets from the sprint backlog Time estimate: Varies with the ticket Skills used: mk:jira-analyst, mk:jira-evaluator, mk:jira-lifecycle, mk:jira-collaborate, mk:jira-relationships, mk:planning-engine, mk:scout, mk:plan-creator, mk:cook, mk:review, mk:ship
Quick path
/mk:jira-analyst AUTH-201 # read the ticket and its attachments
/mk:jira-evaluator AUTH-201 # is it ready to work on?
/mk:jira-lifecycle transition AUTH-201 --to "In Progress"
/mk:plan-creator implement OAuth2 login per AUTH-201 # plan, agree it with the agent
/mk:cook tasks/plans/<plan-dir>/plan.md # build and review
/mk:ship # prepare the commit; `/mk:ship release` opens the PRYou end up with a PR and a ticket moved to its next status. The phases behind mk:cook are explained on Workflow.
Prerequisites
Jira access needs the jira-as CLI and three variables in .meowkit/.env. Jira Integration covers the install, the token and what to check when authentication fails.
Step 1: Understand the ticket
/mk:jira-analyst AUTH-201 # description, acceptance criteria, comments, attachments, links
/mk:jira-evaluator AUTH-201 # complexity and gaps
/mk:jira-estimator AUTH-201 # story point suggestionThe evaluator flags [MISSING] and [AMBIGUOUS] items. If the ticket is unclear, ask the product owner before you continue. Ticket Evaluation explains the output. If the ticket has screenshots, video or a Figma link, see Ticket with Media.
Step 2: Check the ticket against the code
/mk:scout
/mk:planning-engine review AUTH-201 --scoutThe Tech Review Report lists affected files, a feasibility rating, dependencies and risks. mk:planning-engine asks you to run scout first when you pass --scout.
For a bug, run /mk:investigate and paste the ticket description and repro steps into the prompt. It works on your local codebase and does not read Jira.
Step 3: Move the ticket to In Progress
/mk:jira-lifecycle transition AUTH-201 --to "In Progress"mk:jira-lifecycle reads your project's workflow before it suggests transitions. If the ticket is already Done or Closed, check which transitions exist; you may need your team's reopen process.
Step 4: Plan
/mk:plan-creator implement OAuth2 login per AUTH-201The plan goes under tasks/plans/YYMMDD-name/. Read it and agree it before building. For a small, clear fix, skip the plan and run /mk:fix with the ticket text.
Step 5: Implement and review
/mk:cook tasks/plans/<plan-dir>/plan.md
# or, for a quick job
/mk:cook "Implement OAuth2 login per AUTH-201" --fast
/mk:reviewmk:review writes a verdict. Read it before you ship; no hook blocks shipping on it.
Step 6: Ship
/mk:shipBy default mk:ship prepares the commit and asks before it stages or commits. /mk:ship release pushes the branch and opens the PR. On every git commit, git push and gh pr create, the ship check runs lint on the changed files, their related tests and a type-check, and refuses the command if one fails. See Ship Safely.
Step 7: Update the ticket
/mk:jira-lifecycle transition AUTH-201 --to "Done" --resolution Fixed
/mk:jira-collaborate add a comment to AUTH-201: "Implemented OAuth2 login. PR #42."
/mk:jira-relationships link AUTH-201 as relates-to AUTH-202Variations by ticket type
| Ticket | Command order |
|---|---|
| Bug | mk:jira-analyst, mk:jira-evaluator, transition, mk:investigate (paste repro steps), mk:fix, mk:review, mk:ship, transition to Done |
| Story | mk:jira-analyst, mk:planning-engine review --scout, transition, mk:plan-creator, mk:cook, mk:review, mk:ship, transition to Done |
| Technical task | mk:jira-analyst, transition, mk:cook "..." --fast, mk:review, mk:ship, transition to Done |
When something goes wrong
| Situation | What to do |
|---|---|
| Acceptance criteria are vague | The evaluator flags [MISSING]. Ask the product owner. |
| The ticket is too large | The evaluator rates it Complex (8 to 13 points). Ask to split it. |
| Blocked by another ticket | Link it with mk:jira-relationships (blocked-by) and work on something else. |
| Harder than estimated | Run mk:jira-estimator again and share the result with the team. |
| Tests fail after implementing | /mk:investigate, then /mk:fix. |
| Review finds issues | Fix them, run /mk:review again, then /mk:ship. |
Other mk:jira leaves that help here: mk:jira-search (related issues by JQL), mk:jira-time (log work), mk:jira-agile (sprint and epic membership) and mk:jira-dev (branch names and PR descriptions). The mk:jira reference lists them all.
Related
- Spec to Sprint for how tickets get created and planned
- Build a Feature and Fix a Bug
- Review Code and Ship Safely