Tickets to Sprint Planning
Research-driven workflow from ticket evaluation through codebase review to sprint planning.
This playbook evaluates tickets, checks them against the codebase and produces a planning report. You decide what the sprint commits to.
Best for: Tech leads, engineering managers, sprint planners Time estimate: 5 to 15 minutes, depending on ticket count Skills used: mk:jira-evaluator, mk:jira-estimator, mk:planning-engine, mk:jira-issue, mk:scout (optional), mk:confluence-spec-analyst or mk:web-to-markdown for a spec
Not for implementing a ticket
This playbook plans new work into a sprint. To implement an existing ticket, use Ticket to Code.
Quick path
/mk:jira-evaluator AUTH-201 # per ticket: ready?
/mk:jira-estimator AUTH-201 # per ticket: how big?
/mk:planning-engine review AUTH-201 --scout # check the estimate against the codebase
/mk:planning-engine plan --tickets AUTH-201,AUTH-202 --capacity 40You end up with a sprint plan backed by codebase evidence as well as estimates. Every step produces a report that you read and decide on. Nothing creates tickets, assigns people or changes a sprint on its own.
Jira access needs the jira-as CLI and three variables in .meowkit/.env; see Jira Integration.
Step 1: Have tickets
The playbook assumes the work is already in Jira. If you start from a spec, import it first (next section) and create the tickets yourself.
Importing a spec
Confluence:
/mk:confluence-spec-analyst analyze <PAGE-ID>writes a Spec Research Report: requirements, acceptance criteria, gaps and suggested stories. It is read-only.- Resolve the
[MISSING],[VAGUE]and[AMBIGUOUS]flags with the product manager, for example withmk:confluence-collaborateto leave a footer comment on the page. - Optionally scan feasibility with
/mk:scoutand/mk:docs-finder(see step 3 of the walkthrough). - Create the tickets yourself (Step 2).
- In Step 5, pass the report back with
--spec <report-path>.
Notion or another URL: /mk:web-to-markdown <spec-url> converts the page, then /mk:intake on the markdown gives a similar report. Create tickets yourself.
Spec to PR: Behind the Scenes shows every skill in this path in order.
Step 2: Create tickets
For the stories you accept from the report:
/mk:jira-issue create --project AUTH --type Story --summary "Implement OAuth2 login" \
--description "OAuth2 flow for Google and GitHub providers"You choose which stories exist, their priority and their wording.
Step 3: Evaluate and estimate
/mk:jira-evaluator AUTH-201
/mk:jira-estimator AUTH-201You get a complexity assessment and a point suggestion. The team makes the final estimate in planning poker. Ticket Evaluation explains the output.
Step 4: Tech review (optional)
/mk:scout
/mk:planning-engine review AUTH-201 --scoutThe Tech Review Report lists affected files, a feasibility rating, dependencies, risks and complexity signals.
Step 5: Plan the sprint
/mk:planning-engine plan --tickets AUTH-201,AUTH-202,AUTH-203 --capacity 40With a spec report from Step 1:
/mk:planning-engine plan \
--tickets AUTH-201,AUTH-202,AUTH-203 \
--capacity 40 \
--scout \
--spec tasks/reports/spec-research-260511-q3-auth-refresh.mdThe Planning Report has a sprint goal candidate, a dependency map, grouping suggestions and a capacity analysis. With --spec it adds a ## Spec Context (mk:confluence-spec-analyst) section with the upstream requirements, acceptance criteria and gaps. The team then negotiates the sprint goal and commits. For sprint goals, amendments and close-out, see Agile / Scrum.
You can start at any step
| Starting point | Start at |
|---|---|
| Tickets ready | Step 3 |
| A spec or URL | "Importing a spec", then Step 2 |
| One ticket | Step 4 |
| Ready to plan the sprint | Step 5 |
No step needs the previous step's output.
Who decides
| Decision | Who | What the tools give you |
|---|---|---|
| Which stories to create | You | Suggestions in the spec or intake report |
| Story point estimates | The team | Complexity signals |
| Which tickets enter the sprint | The team | Grouping suggestions |
| Sprint goal | Product owner and team | A candidate draft |
| Dependency resolution | The team | Cycle detection |
Related
- Ticket Evaluation for single-ticket evaluation
- PRD Intake for triage of raw tickets
- Ticket to Code for implementing a planned ticket
- Spec to PR: Behind the Scenes
Analyzing Tickets with Media
How MeowKit handles tickets with screenshots, videos, Figma links, and PDFs, and what happens when a tool is missing.
Spec → PR: Behind the Scenes
A ten-step walkthrough of taking a Confluence spec to a merged PR with MeowKit, showing the prompt, the skills, the artifact written and the decision you make at each step.