Agile / Scrum Workflow
Sprint goal, DoR/DoD, retro action items and spike governance, loaded only when an Agile context is detected.
The kit has three conditional rule files for Scrum teams. They load only when a session looks Agile, so other sessions carry none of their cost. They add no agents and no hooks, and every prompt they raise is advisory.
Best for: Teams running Jira-tracked sprints with the kit
Time estimate: Per-sprint ceremonies; no setup beyond the sprint-state file and plan frontmatter
Skills used: mk:plan-creator, mk:sprint-contract, mk:retro, mk:jira-agile, mk:ship, mk:agent-detector
Rules: agile-story-gates.md, agile-sprint-commitment.md and agile-feedback-cycle.md, in .claude/skills/agent-detector/references/
Quick path
/mk:sprint-contract sprint-goal set "<goal>" --sprint 42 # at sprint start
/mk:jira-agile sprint add PROJ-125 --sprint 42 # during
/mk:jira-agile sprint close --sprint 42 # at sprint end
/mk:retro # afterWhat the rules cover
- Definition of Ready: a Phase 1 advisory on each Jira ticket a plan lists.
- Definition of Done: three prompts when a review verdict is PASS or WARN.
- Sprint goal: kept in a file, so it survives across sessions.
- Mid-sprint amendments: scope changes are logged with a reason, not made silently.
- Sprint close: a disposition prompt for each ticket that is not finished, and a closure summary.
- Retro actions: each surfaced item becomes tracked work or a recorded "no action".
- Spikes: time-boxed investigations with a findings document.
Activation
mk:agent-detector loads the three rules at orient time when any one of these is true:
| Trigger | Detection |
|---|---|
| Sprint-state file present | tasks/contracts/sprint-state-*-sprint-*.md matches at least one file |
| Plan frontmatter | jira_tickets: is non-empty in the active plan |
| Environment | MEOW_JIRA_SITE_URL is set |
| Prompt | The last user message matches [A-Z]{2,10}-\d+ |
If references/agile-story-gates.md is missing beside the skill, the load is skipped silently.
Sprint setup
Create the sprint-state file
/mk:sprint-contract sprint-goal set "Reduce p99 checkout latency below 800ms" --sprint 42This writes tasks/contracts/sprint-state-{YYMMDD}-sprint-42.md (the goal is one line, 120 characters at most):
---
sprint_id: 42
sprint_goal: "Reduce p99 checkout latency below 800ms"
start_date: 2026-05-13
end_date: 2026-05-27
committed_tickets: []
amendments: []
status: active
---sprint-goal show --sprint 42 prints the goal, and sprint-goal align --plan <path> compares a plan's goal with it. Writers take a flock on the file before changing it.
Trace plans to Jira
In tasks/plans/{slug}/plan.md frontmatter:
jira_tickets: [PROJ-123, PROJ-124]
sprint_id: 42mk:plan-creator then runs the Definition of Ready advisory, and mk:ship raises the Definition of Done prompts.
Per-sprint ceremonies
Definition of Ready
On a plan with jira_tickets:, /mk:plan-creator checks each ticket for:
- Acceptance criteria text.
- A non-zero story point estimate.
- Sprint linkage, if
sprint_id:is set. - A
mk:jira-evaluatorreport from the last 14 days. - No open
is blocked bylink to a ticket that is not Done.
The output lists the gaps and asks whether to proceed or fix them first. It never blocks.
Mid-sprint scope change
/mk:jira-agile sprint add PROJ-125 --sprint 42If the sprint is active, the skill locks the sprint-state file, asks for the reason for the change (free text, required), appends { ts, action, ticket, reason } to amendments: and then makes the Jira call. In a harness FULL run, mk:sprint-contract amend is used instead.
Definition of Done
Once the verdict has a non-empty jira_tickets: and a status of PASS or WARN, /mk:ship offers three actions, each cancel-safe and each with a Jira-offline fallback (deferred):
- Post the verdict summary to the ticket as a comment.
- Transition the ticket to Done.
- Confirm each business acceptance criterion, taken from the Jira AC field or, if that fails, from the plan's
## Acceptance Criteria.
Without jira_tickets: the whole block is skipped.
Sprint close
/mk:jira-agile sprint close --sprint 42The skill reads committed_tickets:, checks each ticket's status, asks what to do with each one that is not finished (carry over, drop, mark not delivered), and writes status: closed, closed_at, delivered and carried_over to the sprint-state file.
Retro action items
After /mk:retro writes its narrative in an Agile context, it asks about each item under ## 3 Things to Improve and ## 3 Habits for Next Week:
| Option | Effect |
|---|---|
| Create Jira story now | mk:jira-issue create with the body pre-filled; you review before it submits |
| Add to plan TODO | Appends to the active plan |
| Document as no-action | Records the reason in tasks/reports/retros/{date}-decisions.md |
| Defer to next retro | Carries the item forward |
The retro is complete when every item has a disposition. See Sprint Retrospective.
Spikes
/mk:plan-creator --spike --timebox 2d "Investigate JWT refresh strategy options"--spike requires --timebox. It writes a two-phase plan from assets/spike-plan-template.md: investigate (inside the timebox) and document findings (up to 25 percent of the timebox). The frontmatter has spike: true, timebox: and findings_doc:. There is no test phase and no ship phase. Above 5 story points, the plan warns that it is probably two spikes.
Spikes and autobuild
A spike plan skips the test and ship phases, so it does not fit mk:autobuild in FULL density, and mk:plan-creator rejects the combination. Run it through mk:cook or mk:plan-creator --fast.
At the end of a spike you are asked whether to convert the findings into a delivery story, keep them as research only, or defer.
Design
- The plan is the source of truth. Jira receives projections (a verdict comment, a status change) and is never authoritative.
- Every action surfaces a prompt. Nothing creates tickets silently.
- Sprint-state files use a
sprint-state-prefix, so they do not collide with per-story sprint contract files. - Sprint-state files have no validator script. The skills that read them parse the YAML.
Out of scope: WIP limits, async standup cadence, PO acceptance ceremony, velocity hygiene and two-way Jira sync.